




Ultraflex UltraTop PU Top Coat – 5kg Grey
Manufacturer/Brand: Eagle Waterproofing Group
SKU:UTC1C
In stock
Couldn't load pickup availability
Ultraflex waterproofing system with UltraTop – a high-performance, aliphatic polyurethane topcoat designed to provide a durable, gloss finish that’s resistant to UV, weathering, and mechanical stress.
This 5kg tin of UltraTop offers exceptional coverage of up to 30m², making it a cost-effective finishing solution for flat roofs, balconies, terraces, walkways, and gutters. Ideal for both commercial and domestic roofing projects.
Key Features:
- Size: 5kg.
- Finish: Anthracite Gloss (RAL 7043).
- Coverage: Up to 30m² per tin.
- Usage: Apply over Ultraflex within 48 hours for optimal performance.
- Anti-Slip Capability: Can be combined with Ultraflex Slate Granules or silica sand.
- Durability: UV, abrasion, mould, and algae resistant.
- Guarantee: Extends Ultraflex system life to 20+ years; BBA certified for over 25 years.
- Fast-Curing: Trafficable within 3 hours of application.
- Application Areas: Flat roofs, balconies, terraces, walkways, gutters.




Additional Information for Ultraflex UltraTop PU Top Coat – 5kg Grey
Technical Information
Delivery Information
Delivery Information
Standard Delivery
UltraFlex products are delivered directly to your chosen location by the manufacturer.
Standard delivery lead time is 2–5 working days.
Next Working Day Delivery
Need it sooner? We offer:
Next Working Day (AM).
Next Working Day (Anytime).
Orders must be placed before 11:00am for next-day delivery.
Please Note:
Next-day delivery applies to EcoFin branded products only.
Any non-branded EcoFin items may take longer and could arrive separately.
Delivery Times
Deliveries are made Monday to Friday, between 7:00am and 6:00pm, excluding bank holidays and seasonal holidays.
Additional Information
We strongly recommend that you do not schedule any works or contractors until you have received your full order.
Delays can occasionally occur due to stock availability or transport, and it’s best to ensure all materials are on-site before works commence.