Ryno RPS-HD2 Heavy Duty Paving Support Levelling Shim 180mm x 2mm

Skip to product information
1 of 1

Manufacturer/Brand: Ryno Roofing

SKU:51.0007 - RPS-HD2

Regular price £0.43 GBP
Regular price Sale price £0.43 GBP
Sale Sold out
Tax included. Shipping calculated at checkout.

100000 in stock

The Ryno RPS-HD2 Heavy Duty Paving Support Levelling Shim is essential for achieving a level, stable paving surface on flat roofs, balconies, and terraces. Engineered for use with Ryno’s RPS-HD15 Heavy-Duty Stackable Paving Support Pads, these 2mm thick shims provide precision levelling to ensure a flawless installation. With a diameter of 180mm, they offer ideal coverage for large paving slabs, while their durable design ensures stability and longevity.

Key Features:

  • Precision Levelling: Perfectly complements the RPS-HD15 support pads, providing fine adjustments for each paving slab to create a seamless, professional surface.
  • Engineered for Heavy Loads: Designed to withstand the weight of heavy-duty paving projects, ideal for rooftops, terraces, and balcony installations.
  • Enhanced Drainage Design: Featuring integrated holes and slots, these shims allow for effective water runoff while accommodating vertical spacers for a secure fit.

Benefits:

  • Versatile Paving Support: Compatible with a wide range of heavy-duty paving projects, from patios and roof terraces to complex balcony layouts.
  • Customizable Stackable Design: Paired with RPS-HD15 support pads, these shims allow precise levelling adjustments to achieve the perfect height and stability for any project.

Technical Information:

  • Dimensions: 180mm diameter, 2mm thickness.
  • Compatibility: Suitable for RPS-HD15 support pads only.
View full details

Additional Information for Ryno RPS-HD2 Heavy Duty Paving Support Levelling Shim 180mm x 2mm

Technical Information

Delivery Information

Ryno Paving Supports are typically delivered on a next working day service if ordered by lunchtime. This is not a Guaranteed service and you should allow up to 3 working days. Highlands and Islands locations will take longer than this normal type of service.

We strongly recommend refraining from booking, scheduling, or commencing any works until you've received your complete materials order. Your satisfaction and seamless project execution are our top priorities.

FAQ's