01622 962412 (Mon-Fri 7AM-4PM)
Secure Payments
Rated Excellent (view)
Fast UK Delivery
shop@flatroofingsystems.co.ukPaptrim Liquid Applied Roof Coatings Drip Rail Trim
Manufacturer/Brand: Paptrim
SKU:PAPTRIM/D-RAIL/70MM/ANTHRACITE
In stock
Couldn't load pickup availability
Paptrim Liquid Applied Roof Coatings Drip Rail Trim – GRP Edge Trim for Flat Roofs (2.5m).
The Paptrim Liquid Applied Roof Coatings Drip Rail Trim is purpose designed for use with liquid-applied flat roofing systems, providing a neat perimeter edge that promotes effective water run off. Manufactured from a durable polyester-based GRP, this trim delivers reliable protection while maintaining a professional finish on new or refurbished flat roofs.
Lightweight yet highly robust, Paptrim Drip Rail Trims offer strong UV resistance and an exceptionally low rate of thermal expansion. This helps reduce the risk of membrane splitting at joints and prevents future leaks. Resistant to weathering and atmospheric pollutants, the trim requires no ongoing maintenance once installed.
Key Features
- Designed for liquid-applied flat roof coatings and systems.
- Suitable for other waterproofing applications where a drip finish is needed.
- GRP construction with UV and weather resistance.
- Low thermal expansion helps prevent joint cracking and roof leaks.
- Supplied in 2.5m lengths, each with a joining sleeve
- Available in Black or Anthracite Grey.
- Choice of 70mm or 100mm drip face sizes.
- Corners also available for these trims to purchase.
This trim provides a professional, long-lasting perimeter detail for liquid roofing projects, helping ensure secure waterproofing and a clean, durable finish.

Additional Information for Paptrim Liquid Applied Roof Coatings Drip Rail Trim
Technical Information
Delivery Information
Delivery Information
Paptrim trims are dispatched directly to your chosen address and typically arrive within 1–3 working days. A single delivery charge may apply for smaller orders, while larger orders qualify for free delivery at checkout.
We strongly recommend refraining from booking, scheduling, or commencing any works until you've received your complete materials order. Your satisfaction and seamless project execution are our top priorities.