Memtec Double Arm Roller Frame
Manufacturer/Brand: Memtec Ltd
SKU:2227
5000 in stock
Memtec Steel Double Arm Roller Frame is designed for applying Memcol CA or MPU adhesive to Memtec single ply roof membranes or roof substrates and for applying Memcol adhesive to a much larger area.<
Each Frame has a centre pin which is released from the frame by a split pin. Then the centre pin can be placed through the centre of the refill. You will require a Long Wooden Frame Handle to insert into this frame in order that you can use this correctly and comfortably. These Rollers are designed to be used with Memtec Roller Refill Only.
The frames are suitable for use with Memtec Memcol CA Adhesive and Memcol MPU Adhesive.
This is not a Product or System that can be installed by a DIY Enthusiast, untrained or inexperienced roofing contractors. Only suitable roofing contractors that have been trained in the use of PVC Single Ply Membrane Systems will have the expertise and knowledge to install this membrane system correctly.
This is for the Roller Frame Only and the Refills will need to be purchased separately.
The Images are Representative Only. The Product Supplied may vary but will be of Similar Specification and be Suitable for the use intended.
Additional Information for Memtec Double Arm Roller Frame
Technical Information
Delivery Information
Delivery Information
The Memtec Single Ply Range is delivered directly to your chosen location by our network courier partners typically with in 2 - 4 working days.
Deliveries will be completed on a variety of large HGV vehicles which may include Extra Large Articulated HGV Vehicles. Please consider any restrictions close to your location that may impede or stop your delivery from taking place. Please notify us in advance of any restrictions that you feel could be an issue to avoid any potential delays or additional charges being applied. The rolls will be placed on timber pallets and offloaded by a pallet truck and tail lift to the roadside only. We strongly recommend refraining from booking, scheduling, or commencing any works until you've received your complete materials order. Your satisfaction and seamless project execution are our top priorities.