01622 962412 (Mon-Fri 7AM-4PM)
Secure Payments
Rated Excellent (view)
Fast UK Delivery
shop@flatroofingsystems.co.ukAerfoam Insulated Ductwork Bends
Manufacturer/Brand: Ubbink
SKU:188260
In stock
Couldn't load pickup availability
The Ubbink Aerfoam Ductwork Bends are part of Ubbink’s easy-to-install, insulated and airtight ducting system, designed for use in central mechanical ventilation and heat pump systems. Built with efficiency and long-term performance in mind, these bends help minimise the risk of condensation both inside and on the ductwork.
Manufactured to airtightness class D (ATC 2) up to ±200 Pa, Aerfoam bends significantly reduce air leakage, fan energy consumption, and unwanted noise. The insulated construction improves thermal performance, while the lightweight design makes them simple and safe to cut and install on site—saving time without cutting corners.
Available in a wide range of diameters and bend angles, Aerfoam ductwork bends make routing duct runs around obstacles straightforward, even on more demanding installations.
To be able to connect Aerform Ductwork together you will need to purchase a separate Aerform Ductwork connector for each connection/joint and bend location.
Available Diameters
125mm - 150mm - 160mm - 180mm - 200mm.
Available Angles
15° - 30° - 45° - 90°
Key Features
- Insulated duct bends to reduce condensation risk.
- Airtight mechanical connections for quick, secure installation.
- Airtightness class D / ATC 2 up to ±200 Pa.
- Reduced fan energy use and lower sound production.
- Lightweight and easy to cut to length.
- Suitable for MVHR and heat pump systems.
- EPD certified and REACH compliant.
A proper ducting solution that bends when it needs to—without compromising performance. Solid, sensible engineering, just the way it’s always been done.

Additional Information for Aerfoam Insulated Ductwork Bends
Delivery Information
Delivery & Collection Information
Your Ubbink items will be delivered directly to your chosen location via our trusted parcel courier partners. Standard delivery takes 2–5 working days, though this may be longer in remote areas.
We strongly recommend waiting until your full order has arrived before scheduling any work.